NIPPON SZ

NIPPON SZ
For making cement-bonded styrofoam levelling fillers. Characterised by high strength for foot traffic after 24 hours.
Drying Times
after 2 daysFoot traffic
after 1 dayNormal site traffic
after 2 days
- Layer thicknesses: up to 200 mm
DOSAGE & CEMENT QUANTITY
MIXING INSTRUCTIONS
Notes
Downloads
DOSAGE
- 50 kg Cement
- 250 ml Nippon SZ
The mixing instructions refer to a standard mixing vessel with a gross capacity of 250 litres.
MIXING INSTRUCTIONS
- Fill the mixing vessel halfway with granulate.
- Add cement and Nippon SZ to the mixing water.
- Pour in the remaining granulate.
- Gradually and evenly fill with the water.
- We recommend adding water gradually with a watering can to ensure even distribution.
- Final mixing period 2 minutes
Aggregates
- 200 litres of untreated styrofoam fill
- max. 20 l water
- Cement according to release list PCT Chemie
PROCESSING INSTRUCTIONS
- After transporting the material to the processing site, distribute the levelling fill accordingly and level it off.
- Always compact the levelling fill using a hand tamper.
- For layer thicknesses over 10 cm, compact in layers.
Airing
- After installation, ventilate the floor for 20 minutes 2-3 times a day in order to achieve readiness for covering.
- It is possible to use condensation dryers to accelerate the filler drying process, especially at layer thicknesses over 200 mm.
CM MEASUREMENT
- The moisture can be measured with a CM measuring device.
- To do so, the weight of 20 g sample material (taken over the total cross-section of the levelling filler) is sufficient.
- Workability for laying the insulation is obtained if the CM value is ≤ 9 %.
DOSAGE & CEMENT QUANTITY
DOSAGE
- 50 kg Cement
- 250 ml Nippon SZ
The mixing instructions refer to a standard mixing vessel with a gross capacity of 250 litres.
MIXING INSTRUCTIONS
Notes
Downloads