PLAFIZ 211/2000

Improves screed homogeneity and surfaces. For better workability and excellent levelling aid.

  • Plasticising
  • Stripping aid
  • Water retention capacity
  • Against sticking effects
DOSAGE & CEMENT QUANTITY
MIXING INSTRUCTIONS
Notes
Downloads

DOSAGE

  • 50 ml Plafiz
  • The specifications refer to a standard mixing vessel with a net capacity of 250 litres 
     

MIXING INSTRUCTIONS

The specifications refer to a standard mixing vessel with a net capacity of 250 litres 

  • Fill the screed machine half full with sand and the entire amount of cement.
  • Add Plafiz 211/2000 to the first mixing water (usually 5-10 litres) and then fill the machine completely.
  • In the meantime, gradually add the required amount of residual water until the desired working consistency is achieved.

Aggregates

  • Grading curve: according to DIN 1045-2 A/B / BS 13139*, 0–8 mm
  • W/C value: max. 0,6
  • Use of cements according to the PCT cement release list

*UK only

PROCESSING INSTRUCTIONS

  • Working time: 60 minutes
  • Finishing time: 90 minutes
  • Post-mixing time 2 minutes
  • Processing +5 °C to +28 °C
  • Shake canister every 30 minutes.
  • Do not mix with other screed additives
  • Never reactivate screed that has already set with water

Airing

  • If the air humidity is 55 % or higher, ventilate 3-4 times a day for 20-30 minutes 24 hours after screed installation in order to achieve readiness for covering.
  • If the humidity is below 55%, contact PCT technical support to avoid cupping etc.

Protective instructions during and after installation

  • We recommend our PROTEC-ES/SP product to protect against drying out too quickly, depending on the floor covering. We recommend consulting the PCT technical support team.
  • Protect the screed against rapid drying of the surface due to draughts, sunlight and low humidity.
  • Large window fronts and floor-level glass façade areas should be darkened if necessary.
  • Cover screeds in outdoor areas or enclose areas to be covered. Contact PCT technical support if screed is to be laid outdoors.

CM MEASUREMENT

  • A Plafiz 211/2000 screed without an indication of readiness for covering is carried out in accordance with the measurement and assessment standards of DIN 18560/BS-8203*.
  • In this case, PCT Chemie and the Retanol® specialist company are not responsible for the readiness for covering.
  • The CM measurement is therefore carried out as standard by the floor layer as part of his inspection obligation.

*UK only

DOSAGE & CEMENT QUANTITY

DOSAGE

  • 50 ml Plafiz
  • The specifications refer to a standard mixing vessel with a net capacity of 250 litres 
     
MIXING INSTRUCTIONS
Notes