RETANOL® XTREME NEATHERM

Retanol® Xtreme NeaTherm
With extremely high early and final strengths (up to CT-C60-F8), Retanol® Xtreme NeaTherm offers a reliable solution for renovation screeds from 25 mm pipe cover or over dimpled sheets and with a total thickness of 30 mm. In addition, the short time required for covering - 2 days for tiles, 3 days for all other coverings and 5 days with underfloor heating - ensures rapid construction progress.
Drying Times
after the 2nd **/3rd -6th * dayCompressive and flexural strength
up to CT-C60-F8Foot traffic
after 24 hoursNormal site traffic
after 48 hoursCommisioning UFH
after 24 hoursMinimum nominal thickness 2 kN/m²
from 30 mm/25 mm* Pipe cover/nub plateSurface strength
≥ 1,5 N/mm²Shrinkage
SW 2 (SW 1 with Agent X®)Energy efficiency class
EC 3Certification
DGNB conformity, EC1 Plus according to Emicode, emission-tested (TÜV Rheinland)
DOSAGE & CEMENT QUANTITY
MIXING INSTRUCTIONS
Notes
POINT LOADS INFORMATIONS
AREAS OF APPLICATION
Downloads
DOSAGE
| Compressive strength | CT-C40-F6 | CT-C60-F8*** |
| Dosage | 400 ml | 400 ml |
| Cement quantity | 62,5 kg | 75 kg |
| Commisioning cycle | 4 days | 4 days |
* with underfloor heating/bubble slab
** for ceramic coverings
*** 30–40 %, 2–8 mm gravel to be added
- Do not exceed the maximum dosage of 500 ml.
- The specifications refer to a standard mixing vessel with a net capacity of 200 litres and a filling quantity of approx. 320 kg screed gravel.
- The strength class depends on the quality of the screed sand used.
- The specification ‘after the X. Day’ does not include the day of installation.
- The specification ‘after x hours’ begins after the last square metre of screed has been laid.
- For nominal thicknesses over 80 mm, the readiness for covering may be delayed. Therefore, consult technical support in advance to find a joint solution.
MIXING INSTRUCTIONS
- Shake the container well to mix the Retanol® Xtreme NeaTherm additive to a consistent colour before use, and then shake as required throughout the installation to maintain the consistency of the liquid (every 30 mins).
- Fill half of mixing vessel with 0-4 mm screeding sand (60-70% fine grains up to 2 mm in diameter, and 30-40% coarse grains greater than 2 mm in diameter).
- Add Retanol® Xtreme NeaTherm to the first mixing water (usually 5-10 litres), then fill the machine completely.
- Gradually add the required amount of residual water until a stiff-plastic consistency is achieved.
- Let the screed mix for a full 2 minutes.
SAND, WATER, CEMENT
- Grading curve: Sand must be according to DIN 1045-2 A/B / BS 13139*, for the production of screed concrete, grit range 0-4 mm
- W/C value: Min. 0,4 max. 0,6
- Cement: Use of cement according to PCT cement release list
- ≥ C60-F8 and/or ready for covering after the 2nd day for tiles: 75 kg cement grade 42.5 R/N
*UK only
PROCESSING INSTRUCTIONS
- Working time: 45 minutes
- Finishing time: 60 minutes
- Outside temperature: +5 °C to +28 °C for screed, environment and substrate
- Do not mix with other screed additives
- Never reactivate screed that has already set with water
Airing
- If the air humidity is 55 % or higher, ventilate 3-4 times a day for 20-30 minutes 24 hours after screed installation in order to achieve readiness for covering.
- If the humidity is below 55%, contact PCT technical support to avoid cupping etc.
FURTHER PRODUCT FEATURES
- Shrinkage can be further reduced in combination with Agent X®
- Density approx. 2,000 to 2,200 kg/m3
- Thermal conductivity approx. 2.0-2.4 lambda
- Better processing and lower peel resistance
- Minimally effected by building climate conditions
- Reduction of air content
- Start ventilation after 24 hours
- 80-90 % of final strength 3 days after installation
- Moisture protection for at least 4 months
Protective instructions during and after installation
- We recommend our PROTEC-ES/SP product to protect against drying out too quickly, depending on the floor covering. We recommend consulting the PCT technical support team.
- Protect the screed against rapid drying of the surface due to draughts, sunlight and low humidity.
- Large window fronts and floor-level glass façade areas should be darkened if necessary.
- Cover screeds in outdoor areas or enclose areas to be covered. Contact PCT technical support if screed is to be laid outdoors.
CM MEASUREMENT
- A Retanol® screed is considered a proprietary screed within its first 56 days after installation , it can not be tested with a RH test, it must be tested with a calcium carbide method before covering.
Can be tested and approved by PCT Chemie in regard of rest mouisture by PCT Chemie in form of a CM measurement. - The CM measurement, including the issuing of a guarantee declaration and the assumption of the warranty, can be ordered free of charge from PCT Chemie during this period by the Retanol® specialist company, floor layers, tilers or the client. Further information on the release of the screed can be found on our homepage under ‘Guarantee’ (EU only).
- After 56 days, the Retanol® screed is assessed according to the standard values of DIN 18560/BS-8203*.
*UK only
POINT LOADS INFORMATIONS
*** Pipe cover
|
AREAS OF APPLICATION
- For all screeds according to DIN 18560, part 1–7, BS 13892*/BS 8204*
- Particularly suitable for high-strength screeds with a fast readiness for covering
- Screed are suitable for indoor and outdoor areas as well as in permanently wet areas
*UK only
DOSAGE & CEMENT QUANTITY
DOSAGE
| Compressive strength | CT-C40-F6 | CT-C60-F8*** |
| Dosage | 400 ml | 400 ml |
| Cement quantity | 62,5 kg | 75 kg |
| Commisioning cycle | 4 days | 4 days |
* with underfloor heating/bubble slab
** for ceramic coverings
*** 30–40 %, 2–8 mm gravel to be added
- Do not exceed the maximum dosage of 500 ml.
- The specifications refer to a standard mixing vessel with a net capacity of 200 litres and a filling quantity of approx. 320 kg screed gravel.
- The strength class depends on the quality of the screed sand used.
- The specification ‘after the X. Day’ does not include the day of installation.
- The specification ‘after x hours’ begins after the last square metre of screed has been laid.
- For nominal thicknesses over 80 mm, the readiness for covering may be delayed. Therefore, consult technical support in advance to find a joint solution.