RETANOL® XTREME XT

Retanol® Xtreme XT
Retanol® XtremeXT is renowned for its very high early and final strengths and for its guaranteed quick drying times. With Retanol® XtremeXT Screed, tile floor finishes can be installed after 2 days and all other floor finishes after 3 days (or after 5 days where the screed has been installed over underfloor heating). Retanol® XtremeXT Screed reaches 80-90% of its final strength within 3 days of installation and can reach compressive and flexural strengths of C60 N/mm² and F8 N/mm² respectively.
Drying Times
from 3 daysCompressive and flexural strength
up to CT-C60-F8Foot traffic
after 1 dayNormal site traffic
after 2 daysCommisioning UFH
after 1 dayMinimum nominal thickness 2 kN/m²
from 35 mm/30 mm* pipe cover bonded 12 mmSurface strength
≥ 1,5 N/mm²Shrinkage
SW 2 (SW 1 with Agent X ®)Energy efficiency class
EC 3Certification
DGNB conformity, emission-tested (TÜV Rheinland), EC1 Plus according to Emicode
DOSAGE & CEMENT QUANTITY
MIXING INSTRUCTIONS
Notes
POINT LOAD INFORMATION
AREAS OF APPLICATION
Downloads
DOSAGE
| XTREME | XTREME HD | XTREME ULTRA HD | |
| Compressive strength | CT-C40-F6 | CT-C45-F6 | CT-C60-F8** |
| Dosage | 400 ml | 480 ml | 480 ml |
| Cement quantity | 62,5 kg | 75 kg | 75 kg |
| Commisioning cycle | 4 days | 4 days | 4 days |
* with underfloor heating
** 30-40 % 2-8 mm gravel to be added
- Do not exceed the maximum dosage of 500 ml.
- The specifications refer to a standard mixing vessel with a net capacity of 200 litres and a filling quantity of approx. 320 kg screed gravel.
- The strength class depends on the quality of the screed gravel used.
- The specification ‘after the X. Day’ does not include the installation day.
- For nominal thicknesses over 80 mm, readiness for covering may be delayed. Therefore, consult with technical support in advance to find a joint solution.
MIXING INSTRUCTIONS
- Shake the container well to mix the Retanol® XtremeXT additive to a consistent colour before use, and then shake as required throughout the installation to maintain the consistency of the liquid (every 30 mins).
- Fill half of mixing vessel with 0-4 mm screeding sand and required cement.
- Dilute Retanol® XtremeXT with the first mixing water (usually 5-10 litres), then fill the machine completely.
- Gradually add the required amount of residual water until a stiff-plastic consistency is achieved.
- Mix screed for full 2 minutes.
SAND, WATER, CEMENT
- Grading curve: Sand must be according to BS 13139, for the production of screed concrete, grain size range 0-4 mm
- W/C value: Min. 0,4, max. 0,6
- Cement: Use of cement according to the PCT cement release list
- ≥ C60-F8 and/or ready for covering after the 2nd day for tiles: 75 kg cement grade 42.5 R/N or above
PROCESSING INSTRUCTIONS
- Working time: 45 minutes
- Finishing time: 60 minutes
- Outside temperature: +5 °C to +28 °C for screed, environment and substrate
- Do not mix with other screed additives
- Never reactivate set screed with water
Airing
- If the air humidity is 55 % or higher, ventilate 3-4 times a day for 20-30 minutes 24 hours after screed installation in order to achieve readiness for covering.
- If the humidity is below 55%, contact PCT technical support to avoid cupping etc.
FURTHER PRODUCT FEATURES
- Shrinkage can be further reduced in combination with Agent X®
- Density approx. 2,000 to 2,200 kg/m3
- Thermal conductivity approx. 2.0-2.4 lambda
- Better processing and lower peel resistance
- Minimally effected by building climate conditions
- Reduction of air content
- Start ventilation after 24 hours
- 80-90 % of final strength 3 days after installation
- Moisture protection for at least 4 months
Protective instructions during and after installation
- We recommend our PROTEC-ES/SP product to protect against drying out too quickly, depending on the floor covering. We recommend consulting the PCT technical support team.
- Protect the screed against rapid drying of the surface due to draughts, sunlight and low humidity.
- Large window fronts and floor-level glass façade areas should be darkened if necessary.
- Cover screeds in outdoor areas or enclose areas to be covered. Contact PCT technical support if screed is to be laid outdoors.
CM MEASUREMENT
- A Retanol® screed is considered a proprietary screed within its first 56 days after installation , it should not be tested with a RH test, it must be tested with a calcium carbide method before covering.
Can be tested and approved by PCT Chemie in regard of rest mouisture by PCT Chemie in form of a CM measurement. - After 56 days, the Retanol® screed is assessed according to the standard values of BS-8203.
POINT LOAD INFORMATION
| Area load Point load | 2,0 kN/m2 1,0 kN | 3,0 kN/m2 2,0 kN | 4,0 kN/m2 3,0 kN | 5,0 kN/m2 4,0 kN | 7,5 kN/m2 6,0 kN | 10,0 kN/m2 8,0 kN |
| Flexural strength ≥ F6 (with UFH) | 30 mm*** | 30 mm*** | 40 mm | 45 mm | 70 mm | 85 mm |
| Flexural strength ≥ F6 (without UFH) | 35 mm | 35 mm | ||||
| Flexural strength ≥ F8 (with UFH) | 30 mm*** | 30 mm*** | 40 mm | 40 mm | 60 mm | 80 mm |
| Flexural strength ≥ F8 (without UFH) | 35 mm | 35 mm |
***Pipe coverage
- Unless otherwise defined, data as minimum nominal thickness (without UFH) or minimum pipe cover (with UFH).
AREAS OF APPLICATION
- For all screeds according to BS 13892/BS 8204
- Particularly suitable for high-strength screeds with a fast readiness for covering
- Screed suitable for indoor and outdoor areas as well as in permanently wet areas
DOSAGE & CEMENT QUANTITY
DOSAGE
| XTREME | XTREME HD | XTREME ULTRA HD | |
| Compressive strength | CT-C40-F6 | CT-C45-F6 | CT-C60-F8** |
| Dosage | 400 ml | 480 ml | 480 ml |
| Cement quantity | 62,5 kg | 75 kg | 75 kg |
| Commisioning cycle | 4 days | 4 days | 4 days |
* with underfloor heating
** 30-40 % 2-8 mm gravel to be added
- Do not exceed the maximum dosage of 500 ml.
- The specifications refer to a standard mixing vessel with a net capacity of 200 litres and a filling quantity of approx. 320 kg screed gravel.
- The strength class depends on the quality of the screed gravel used.
- The specification ‘after the X. Day’ does not include the installation day.
- For nominal thicknesses over 80 mm, readiness for covering may be delayed. Therefore, consult with technical support in advance to find a joint solution.